Vonco II Waste Management Campus

Sherburne County, Minnesota

  • Provided all engineering, construction management and environmental services on a 160-acre site, beginning with siting and permitting
  • Completed a hydrogeologic evaluation, including soil borings and monitoring wells, and prepared hydrogeologic investigation reports
  • Prepared documents and obtained approval for leachate land application area on the landfill property
  • Conducted oversight during construction of the liner and leachate collection system
  • On-going services include ground water, surface water, and leachate sampling, design, construction oversight and preparation of quarterly and annual reports

Client: Veit Companies